Arizona Corporation Commission
1200 W. Washington Street Phoenix, AZ 85007 RE: Comments on the August 30, 2024 Utilities Division Memorandum and Amendments, Docket No. E-99999A-22-0046 Chairman and Commissioners, On August 30, 2024, Commission Staff filed a Memorandum with their recommendations as to the Integrated Resource Plans (IRP) of Arizona Public Service (APS), Tucson Electric Power (TEP), UNS Electric (UNSE), and Arizona Electric Power Cooperative (AEPCO).[1] AriSEIA participates on the Resource Planning Advisory Council (RPAC) for APS and TEP and has for many years. I. AriSEIA IRP Engagement AriSEIA first filed in this docket on April 28, 2023 expressing concerns about the delay with APS and TEP providing the modeling licenses that were required from the 2020 IRP Order (Decision No. 78499).[2] It had been 15 months and stakeholders still did not have nondisclosure agreements (NDAs) executed, licenses, or utility data. At that time, we asked for an IRP filing extension, as it takes months to review these models. AriSEIA reiterated these concerns verbally at the June 21, 2023 Open Meeting. AriSEIA also hired a consultant and obtained a modeling license for this IRP. AriSEIA filed two different sets of comments in this docket on January 31, 2024. The comments we filed with our consultant, Rocky Mountain Institute (RMI), are 263 pages long.[3] These comments included comprehensive slides as to their review of the modeling done by APS (60 slides) and TEP (63 slides). We presented this work one on one with each utility and to each RPAC (four total presentations). Plus, RMI provided a presentation to each RPAC on IRP best practices (another two presentations, for six total presentations). We also provided an abbreviated version of the slides to Commission Staff, which we presented at the IRP workshop on July 31, 2024. AriSEIA also attended all of the modeling trainings and briefed APS on what we intended to do with the model before we ever obtained a license. AriSEIA also filed individual comments on the IRP on January 31, 2024, which were 142 pages in length.[4] Those comments focused on our recommendations for the next IRP (the 2026 IRP). Those recommendations are worth repeating here, as many of them are not included in Staff’s recommendation. Namely we recommend retaining the following requirements from the 2020 IRP Order:
We also recommended the inclusion of the following new requirements:
The Sierra Club filed 36 pages of single spaced comments on the APS plan[19] and 26 single spaced comments on the TEP plan[20] on January 31, 2024 and hired Synapse Energy Economics, Inc. to review the models. WRA filed 24 pages of single spaced comments on the TEP plan[21] and 49 pages of single spaced comments on the APS plan.[22] WRA hired Energy Strategies as their consultant on the model analysis, as well as to conduct their own modeling. Sierra Club and WRA also presented their work to the RPAC. Other than Staff, AriSEIA is not aware of any other stakeholder obtaining a modeling license. Collectively, the stakeholders that obtained modeling licenses filed 540 pages of analysis and gave at least 11 presentations on our work between the RPAC, the utilities, and the Commission. And that is despite the fact that we received the licenses and data from the utilities very late in the process. Until TEP filed comments on May 31, 2024, it had never before been asserted that the stakeholders had used the licenses insufficiently.[23] APS did not assert there was any deficiency with the stakeholder use of the licenses until August 26, 2024, nearly seven months after the stakeholders filed their comments.[24] II. Staff Recommendation AriSEIA did no less work than Staff did with the modeling license. In Staff’s recommendation, they wrote: "Staff did find value in being able to navigate the software and step through the inputs in the project files…. Staff believes this software is important for Staff’s analysis in the IRP process. Staff recommends that APS, TEP, and UNSE continue to provide Staff` with a license to the Aurora Modeling Software."[25] Staff then acknowledges the numerous issues stakeholders had in obtaining licenses from the utilities, stating: "Stakeholders in the RPAC stated that they experienced difficulties with fully utilizing the licensing that was provided because of timelines and insufficient data sharing. As a result, stakeholders modeling effects were not as impactful as they could have been. APS only provided the project files for its reference case and TEP and UNSE only provided the project files for its base case."[26] Despite Staff stating that even though they did not do their own modeling and acknowledging the many issues stakeholders encountered with the utilities in being able to access the models, Staff removes the requirement to provide modeling licenses to stakeholders. The 2020 IRP order stated: "IT IS FURTHER ORDERED that Arizona Public Service Company, Tucson Electric Power Company, and UNS Electric, Inc. shall in future Integrated Resource Plans negotiate a project-based licensing fee that permits up to 12 Resource Planning Advisory Council members and Staff the ability to perform their own modeling runs in the same software package as these load serving entities, and to provide all necessary data and support to fully utilize the models. The load serving entities shall absorb the cost of the licensing fees."[27] Despite recommending removal of this requirement, Staff then states that “Staff believes that transparency in the IRP process is important to develop comprehensive IRPs.”[28] However, removing the requirement to provide access to the modeling inhibits transparency. Staff’s only stated reason for removing the modeling requirement for stakeholders is cost.[29] However, a reimbursement model would not lower costs. In fact, because it would create additional administrative burdens, it would likely cost more. There is nothing in the Staff Recommendation that articulates the process by which Staff or the utilities will manage a reimbursement program. Some initial questions include: · Who will manage and monitor this program? · By what date must the utilities reimburse the costs of the modeling licenses? · What is the deliverable that stakeholders must provide to the utilities and by when? · What is the remedy process should there be a dispute? Additionally, it is unclear if the utilities will be able to negotiate a reduced rate license if the stakeholders are to procure the licenses on their own to be potentially reimbursed someday if the utilities, in their sole discretion, deem it warranted. For example, WRA objectively met the never before stated requirement to model their own portfolios (something Staff admits they did not do). Therefore, if only WRA is entitled to reimbursement and that license is astronomically more expensive than the negotiated bulk licenses procured by the utility, the reimbursement could be higher than it is with the current system. Further, a reimbursement program would make it impossible for small nonprofits, such as AriSEIA, to participate at all. AriSEIA has never missed an RPAC meeting. AriSEIA has objectively actively engaged in this docket. It has never been asserted that we do not participate or contribute and yet, under the Staff Recommendation, we are the stakeholder that would be excluded from this process going forward. AriSEIA reached out to Staff three times before this filing in an attempt to understand what problem they are trying to solve with their recommendations, but we were not provided the opportunity to discuss this issue. AriSEIA objects to Staff recommendations 7 and 8 (also known as G and H). Those recommendations will not increase transparency. There is also no evidence that those recommendations will save ratepayers’ money. AriSEIA also objects to Staff recommendation 13 (also known as M). The proper way for the Commission to modify a prior order is through A.R.S. § 40-252. Also, the Staff Recommendation is missing several of the items listed on page 2 above from the 2020 IRP Order that are still very valuable, such as:
AriSEIA also recommends the utilities model ten, not seven, portfolios in the 2026 IRP. Staff recommended only seven in its recommendation 14 (also known as N). The Commission removed the requirement for Staff to obtain a consultant to provide an independent review of the IRPs.[30] This is reason enough for continued stakeholder access to the models. Removing the third party requirement and limiting stakeholder participation in the IRP docket is a step in the wrong direction and takes us back to the backbox utility IRPs that we not acknowledged by the Commission in prior years.[31] This is the first time the utilities have ever provided modeling access and no evidence has been provided that those licenses were misused. No evidence has been provided that removing that requirement will save ratepayers money. Therefore, AriSEIA has provided two Proposed Amendments below. III. Battery Storage Baseload resources are resources that run consistently all or most of the time. Nuclear is an example. You are not going to ramp up and down a nuclear plant based on changes in demand. Dispatchable resources are resources that can be increased or decreased on demand as the needs of the grid change. Some resources are both, such as geothermal and hydropower. They can be run consistently or they can be ramped up and down based on needs. Some resources like gas peakers (combustion turbines (CTs)) and batteries are dispatchable, but are not baseload. Batteries can be dispatched as needed.[32] There are many kinds of storage, batteries are one type. There are many different kinds of battery technologies and they have different capabilities. There are lithium ion batteries, redox flow batteries, lead batteries, vanadium redox flow batteries, nickel-cadmium batteries, sodium sulfur batteries, iron-chromium flow batteries, and zinc-bromine flow batteries.[33] The durations of these technologies range from two hours to ten hours.[34] Indeed, Salt River Project (SRP) has a ten hour flow battery expected to be operational by Q1 of 2026.[35] Batteries are dispatchable. Therefore, they should not be excluded from the Commissioner Thompson and Commissioner Myers Joint Proposed Amendment No. 1. Further, singling out specific technologies undermines the utilities’ usage of all source requests for proposals (ASRFPs). The entire point of moving to ASRFPs is so that all resources have a level playing field on which to compete on cost and utility needs. The Commission singling out specific technologies that cannot be used for capacity or resource planning will jeopardize affordability. Further, it undercuts innovation. Why would the Commission want to choose winners and losers in a game with constantly improving technology? Additionally, specifically eliminating certain technologies makes the utilities more vulnerable to supply chain constraints. A war, natural disaster, new political administration, global pandemic, port strike, etc. can all impact which technologies are available and affordable at any given time. Why would the Commission want to constrain those options? As the amendment is drafted, the only resources that appear to count as “dependable and dispatchable capacity, not including battery storage” but also “approved” after December 31, 2024 and before 2031 would be gas peakers (CTs). Specifying how much of what kind of resource a utility must buy and when, in order to make an additional decision about which plants to retire, is very prescriptive and may be more of a managerial decision than a regulatory one. Finally, because APS first announced it was closing Four Corners in 2020. It is not clear why the new capacity resources that APS must procure to replace Four Corners need be procured only after December 31, 2024. All capacity resources APS procures to replace Four Corners should count for resource adequacy purposes. That being said, AriSEIA understands the purpose of the Amendment and has suggested a friendly amendment below to maintain the spirit of the Amendment while being technology agnostic. IV. Commissioner and Staff Amendments AriSEIA has reviewed the documents filed by Staff, Commissioner Myers, and Commissioner Thompson. AriSEIA supports Staff Proposed Amendment No. 1. The utilities have been clear that the coal retirement dates are economic decisions. AriSEIA opposes Staff Proposed Amendment No. 3. This amendment makes the data that the utilities are to provide to stakeholders with the modeling licenses more ambiguous. “Portfolios” are more specific. If Staff wishes to add “information” it should be additive to and not in lieu of the “portfolios.” AriSEIA opposes Staff Proposed Amendment No. 2. This language is removed by AriSEIA Proposed Amendment No. 1. Further, this language is redundant. For the stakeholder to have modeling results, they would have to use the software. AriSEIA supports Commissioner Myers Proposed Amendment No. 3. Ensuring the accuracy of load forecasts is essential for maintaining reliability and ensuring affordability. AriSEIA supports Commissioner Myers Proposed Amendment No. 6. Regional markets participation is a relevant factor that can impact resource selections and costs and should be included in long term planning. AriSEIA has offered a friendly amendment to Commissioner Thompson and Commissioner Myers Joint Proposed Amendment No. 1. AriSEIA supports efforts to ensure resource adequacy, but does not think the Commission should exclude any technologies that provide “dependable and dispatchable capacity.” Please see AriSEIA Proposed Amendment No. 3. Respectfully, /s/ Autumn T. Johnson Executive Director AriSEIA (520) 240-4757 [email protected] [1] Arizona Corporate Commission, Staff’s Integrated Resource Plans (IRP) Recommendation, August 30, 2024, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000037784.pdf [hereinafter Staff Recommendation]. [2] AriSEIA, Letter to Commission on IRP, April 28, 2023, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000026311.pdf?i=1727931647086. [3] AriSEIA, Vote Solar, and Advanced Energy United, Joint Comments to Commission on IRP, January 31, 2024, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000033451.pdf?i=1727931647086. [4] AriSEIA, Comments to Commission on IRP, January 31, 2024, Docket No. E-99999A-22-0046, at 4-5, available here https://docket.images.azcc.gov/E000033415.pdf?i=1727931647086. [5] Arizona Corporate Commission, Staff Assessment of 2020 IRP, March 2, 2022, Decision No. 78499, at 11:1-2, available here https://docket.images.azcc.gov/0000206081.pdf?i=1700515655944 [hereinafter 2020 IRP Order]. [6] Id. at 11:8-13. [7] Id. at 13:10-16. [8] Id. at 14:5-8. [9] Id. at 14:9-14. [10] Id. at 14:15-17. [11] Id. at 14:22-25. [12] Id. at 15:1-3. [13] Id. at 15:4-6. [14] Id. at 15:7-9. [15] Id. at 15:14-16. [16] Id. at 17:15-17. [17] AriSEIA, Letter to Commissioners, August 27, 2024, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000037591.pdf?i=1727931647086. [18] Utilities Division Staff, IRP Memorandum, July 29, 2024, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000036917.pdf?i=1727931647086. [19] Sierra Club, Comments on the APS 2023 IRP, January 31, 2024, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000033488.pdf?i=1727931647086. [20] Sierra Club, Comments on the TEP 2023 IRP, January 31, 2024, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000033487.pdf?i=1727931647086. [21] WRA, Notice of Filing Comments on the 2023 IRP of TEP, January 31, 2024, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000033471.pdf?i=1727931647086. [22] WRA, Amended Notice of Filing Comments on the 2023 IRP of APS, January 31, 2024, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000033473.pdf?i=1727931647086. [23] TEP, Response to Stakeholder Comments, May 31, 2024, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000035982.pdf?i=1727931647086. [24] APS, Response to Commissioner Questions, August 23, 2024, Docket No. E-99999A-22-0046, available here https://docket.images.azcc.gov/E000037555.pdf?i=1727931647086 (APS asserts they purchased a total of six licenses for stakeholders. It is unclear if this number includes Staff. It is unclear who the additional licenses were for and contradicts information APS has provided as to the total amount spent on the licenses. It also falsely asserts that “APS is not aware of whether any other stakeholders utilized the remaining licenses,” despite us presenting at least 11 total times.) [25] Staff Recommendation at 86. [26] Id. at 86-87. [27] 2020 IRP Order at 14:9-14. [28] Staff Recommendation at 87. [29] Id. [30] Arizona Corporate Commission, Order, June 20, 2024, Decision No. 79385, Docket No. E-00000V-15-0094, available here https://docket.images.azcc.gov/0000211300.pdf?i=1727936736722. [31] Arizona Corporate Commission, Order, March 29, 2018, Decision No. 76632 at 53:4-6, Docket No. E-00000V-15-0094, available here https://docket.images.azcc.gov/0000186964.pdf?i=1727936284687. [32] American Clean Power, Clean Energy Storage Facts, available here https://cleanpower.org/facts/clean-energy-storage/. [33] American Clean Power, Battery Storage, available here https://cleanpower.org/facts/clean-energy-storage/battery-storage/. [34] Id. [35] Salt River Project and CMBlu Energy Announce Launch of Innovative Long-Duration Energy Storage Project, Aug. 31, 2023, available here https://media.srpnet.com/salt-river-project-and-cmblu-energy-announce-launch-of-innovative-long-duration-energy-storage-project/.
0 Comments
Leave a Reply. |
AriSEIA NewsKeep up with the latest solar energy news! Archives
October 2024
Categories
All
|