AriSEIA Submits Comments on Navajo County's Renewables Ordinance

6/13/2025

0 Comments

 
Navajo County
100 East Code Talkers Drive
Holbrook, AZ 86025
 
RE: Navajo County Zoning Ordinance Update, Article 12: Renewable Energy
 
Supervisors, Commissioners, and Community Development Staff,

The Arizona Solar Energy Industries Association (AriSEIA) appreciates the opportunity to provide comments on the draft zoning ordinance for renewable energy facilities in Navajo County. AriSEIA is a nonprofit trade association representing the solar and storage industries across Arizona. We advocate for thoughtful, streamlined, and effective land use policies that enable renewable energy development while respecting community values and local priorities. We have previously engaged on the City of Eloy, Mohave County, City of Buckeye, Town of Chino Valley, Yavapai County, City of Surprise, and Apache County solar/storage ordinances.

We commend the County’s efforts to develop a regulatory framework for renewable energy and offer the following comments and recommendations to improve clarity, reduce unintended burdens, and ensure alignment with industry standards and legal precedents.

I. General Legal and Process Concerns
1. Entitlements Should Not Require BOS Approval to Transfer

We recommend against the provision requiring Board approval for the transfer or assignment of an approved Special Use Permit (SUP). Land use entitlements run with the land—not the landowner—and cannot be subject to reassignment approvals. Requiring discretionary approval for every property transfer introduces legal uncertainty and would significantly chill investment. If the original conditions remain in effect and are adhered to by the new owner, no additional approval should be required.

2. Clarity on the Relationship Between SUPs and Development Agreements
The draft appears to treat Development Agreements and SUPs as overlapping but does not clearly delineate the requirements for each. Specifically, it is unclear whether the Development Agreement will incorporate requirements from Section 1201(2)(u). Greater clarity is needed to avoid duplicative or conflicting obligations.

II. Comments on Draft Article 12 – Section 1201 (Solar and General Renewable Energy)
3. Impervious Surface Designation
We strongly urge the County to clarify that solar arrays are not considered impervious surfaces and are exempt from the Maximum Lot Coverage standards in A-General (50%) and RU-20 (3%) zones. The definition of “impervious” should be revised or clarified to exclude structures like solar arrays, particularly when vegetation or non-compacted soils are preserved beneath the panels.

4. Underground Collection Line Requirement (1201(2)(d))
We recommend flexibility in the siting of collection lines. While undergrounding may reduce some visual impacts, it can increase cost and site disturbance. These lines typically run within the array footprint and are low-profile. Allowing above-ground options where appropriate could reduce environmental disruption and construction costs.

5. Fence Height Discrepancy (1201(2)(r))
The draft permits fences up to 8 feet in height for renewable energy projects, but the general zoning standards cap fence/wall height at 7 feet. This inconsistency should be resolved to avoid ambiguity in enforcement.

6. Decommissioning Bond Timing and Beneficiaries (1201(2)(s))
We recommend phasing the decommissioning bond over the first 10 years of operation, with full bonding (minus salvage value) required by year 10. This balances financial feasibility with long-term accountability. Additionally, we urge the County to designate a single bond beneficiary—typically the County—to streamline administration and avoid disputes.

7. Tribal Consultation Guidance (1201(2)(v))
We request that the County provide clear expectations for what constitutes adequate tribal consultation. This includes what documentation will be accepted and what level of engagement is required.

8. Public Communication Requirements (1201(2)(x))
The requirement for lifetime responsiveness to inquiries is operationally unfeasible. We suggest limiting real-time responsiveness to the construction phase. For long-term operations, we propose a 24/7 emergency hotline, a publicly available online form, and a monthly response requirement for general inquiries.

9. Public Outreach and Project Changes (1201(2)(u))
We request clarity on whether the outreach described in 1201(2)(u) is a prerequisite to the public hearing process and what happens if key project features change after notifications are sent to surrounding landowners. A mechanism for reasonable updates should be included.

10. Avoid Regulatory Overreach into Federal or State Jurisdiction (1201(2)(j), 1201.1)
The ordinance appropriately avoids regulating projects on federal or state land but then attempts to impose technical standards (e.g., on experimental components or wildlife policy) outside the County’s expertise. Sections referencing FAA, USFWS, and other federal authorities should defer to their standards rather than impose independent criteria.

11. Problematic Language and Ambiguities
We recommend removing vague or subjective standards such as “minimal visual impact,” “low wildlife habitat value,” or “maximum extent possible.” These terms lack clear metrics and create enforcement risk. More appropriate phrasing would be “to the maximum extent feasible” with reference to applicable regulatory guidance.

12. Feedback Cards and Tabulated Results (1201(2)(u)(ii))
The ordinance calls for tabulating community feedback, but such data often reflects opposition bias due to self-selection. It should be considered informational, not determinative.

13. Decommissioning Enforcement (1201(2)(aa)(ii))
The ordinance should include standard cure period language to protect against subjective enforcement or abrupt bond forfeiture. This provides fairness and legal clarity in the event of a dispute.

III. Comments on Draft Article 12 – Section 1202 (Wind-Specific Provisions)
14. Noise Standards (1202(1)(a) & (b))
We recommend adopting standard sound thresholds of 45 dBA at night and 55 dBA during the day, based on EPA guidance. The “baseline plus 5 dBA” approach is difficult to measure and legally risky due to inconsistent baseline data.

15. Low-Frequency Noise (1202(1)(c))
We strongly recommend removing all references to low-frequency noise. There is no peer-reviewed scientific evidence supporting its health impacts, and this provision responds to misinformation rather than substantiated risk.

16. Wind Turbine Setbacks (1202 generally)
The proposed setbacks are excessive and unsupported by public health data, effectively amounting to a ban on wind development. AriSEIA has provided the below table of commonly accepted setbacks that maintain public safety while allowing viable project siting. 

Occupied Community Buildings
Nearest Structure
2.1x tip height (meters)

Participating Residences
Nearest Structure
1.1x tip height (meters)

Non-Participating Residences
Nearest Structure
2.1x tip height (meters)

Non-Participating Property Lines
Property Line
1.1x tip height (meters)

Public Road Rights-of-way
Centerline+60 feet
1.1x tip height (meters)

Setback from publicly managed lands
Property Line
2.1x tip height (meters)

County Roads
Center Line+30 feet
1.1x tip height (meters)

Overhead communication lines
Centerline+50 feet
1.1x tip height (meters)

Shadow Flicker
Tower Base
30 (hrs/yr at receptor)

Transmission and Distribution lines
Centerline+50 feet
1.1x tip height (meters)

Railroads
Centerline+50 feet
1.1x blade length (meters)

Public use areas/buildings, office buildings
Nearest Structure
1.1x tip height (meters)

Boundaries of Incorporated Communities
Boundary Line
1.0 (mile)

O&G pipelines
Center Line+30 feet
1.1x blade length (meters)

Sound emissions - daytime
Tower Base
55 (dBA)

Sound emissions - nighttime
Tower Base
45 (dBA)

Ice-Throw Setback
Tower Base
1.1x tip height (meters)
 
IV. Final CommentsThis draft ordinance includes several constructive elements but also introduces significant risks of legal challenge, development delays, and regulatory overreach. AriSEIA urges the Commission and/or Board to revise the ordinance to ensure clarity, legal consistency, and feasibility for renewable energy developers while maintaining appropriate community safeguards. We remain available to support the County in this process and provide additional detail upon request.

Thank you for your consideration.

Respectfully,
Autumn Johnson
Executive Director
AriSEIA 
(520) 240-4757
[email protected]
navajo_county_ordinance_letter_6.13.2025.pdf
File Size: 218 kb
File Type: pdf
Download File

0 Comments



Leave a Reply.

    AriSEIA News

    Keep up with the latest solar energy news!


    Archives

    January 2026
    December 2025
    November 2025
    October 2025
    September 2025
    August 2025
    July 2025
    June 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    November 2021
    July 2021
    November 2020
    October 2020
    September 2020
    August 2020
    June 2020
    April 2020
    January 2020
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018

    Categories

    All
    ACC Updates
    ADOT
    Apache County
    APS
    Arizona Department Of Environmental Quality (ADEQ)
    ASU
    Autonomous Vehicles
    Auxin
    Avoided Cost
    AZ Legislature
    BBB
    BESS
    BLM
    Chino Valley
    City Of Buckeye
    City Of Eloy
    City Of Flagstaff Updates
    City Of Mesa
    City Of Tempe Updates
    Community Solar
    Consumer Protection
    Coolidge Expansion
    DDSR Aggregation
    DG
    Election
    Electric Vehicles
    Electrification
    Energy Rules
    EVs
    Federal Policy
    FTC
    GAC
    Governor's Office
    Grid Access Charge
    HB2101
    Hopi
    Hydrogen
    Interconnection
    IRA
    IRP
    Just Transition
    Line Siting
    Local Government
    Maricopa County
    Meters
    Mohave County
    Municipalities
    Navajo County
    Navajo Generating Station Updates
    Navajo Nation Energy Updates
    Newsletter
    Project Bella
    Proposition 127
    Public Lands
    Rate Cases
    RCP
    Resource Planning
    REST
    ROC
    SolarApp
    Solar For All
    SRP Updates
    SSVEC
    State Energy Office
    Storage
    Sulphur Springs
    SunZia
    Surprise
    Tariffs
    TEP
    Transmission
    Trico
    Tucson Updates
    UNSE
    Utilities
    Utility Scale
    Value Of Solar
    VPP
    Yavapai County
    Zoning

    RSS Feed

Picture
The Arizona Solar Energy Industries Association (AriSEIA) is a 501(c)(6) non-profit trade association representing the solar, storage, and electrification industry, solar-friendly businesses, and others interested in advancing complementary technologies in Arizona. The group's focus is on education, professionalism, and promotion of public policies that support deployment of solar, storage, and electrification technologies and renewable energy job growth and creation.

FOLLOW Us

JOIN ARISEIA
Donate
Join Our Email List
Copyright © 2019 AriSEIA - All Rights Reserved 





  • Home
  • 2026 CONFERENCE
  • Programs
  • About
    • Board of Directors
    • Executive Director & Staff
    • AriSEIA Members
    • Events
    • Jobs
    • Solar Customers
    • Myths Busted
    • Contact Us
  • Join
    • Code of Ethics
  • Donate
  • News