|
City of Tucson Planning Commission
c/o Planning and Development Services P.O. Box 27210 Tucson, AZ 85726-7210 Via email: [email protected] RE: Agenda Item 5, CODE Tucson '26 Code Amendment (C8-25-03), Attachment E – Proposed Battery Energy Storage System Amendment Dear Chair and Commissioners, The Arizona Solar Energy Industries Association (AriSEIA) is the statewide trade association for the solar, storage, and electrification industry. We have engaged extensively on battery energy storage system (BESS) ordinances across Arizona, including in Maricopa County and the Cities of Mesa, Buckeye, Goodyear, and Surprise. We appreciate staff's work on the CODE Tucson '26 package and support the City's goal of creating a clear pathway for this critical infrastructure. AriSEIA respectfully requests that the Commission continue the BESS amendment (Attachment E and the "Define battery storage use" item), or sever it from the CODE Tucson '26 package so the remaining amendments may proceed, to allow for a stakeholder process on the new proposal. Request for Continuance According to the staff memorandum, the BESS proposal reviewed at the August 26 and September 16 study sessions would have added BESS as part of the existing Distribution System use. After the September 16 study session, that approach was replaced with a standalone, two-tier use and eleven new use-specific standards. This new version first appeared in the October 1 packet for the October 7 hearing. It has not been presented at a study session. It was not part of the surveys or community meetings described in the memorandum. To our knowledge, it has not been shared with the storage industry, Tucson Electric Power, or the commercial and institutional customers it would directly affect. AriSEIA did not learn of the proposal until Friday, October 2. Three business days is not enough time for affected businesses, schools, hospitals, and developers to review it, let alone engage meaningfully. A short continuance would allow staff to hold at least one stakeholder meeting with industry, Tucson Electric Power, and the Tucson Fire Department, and return with a proposal tested against real projects. Severing the BESS item would let the rest of the package move forward on schedule. AriSEIA's preliminary comments on the substance of the proposal follow. 1. Size Thresholds and Commercial and Industrial Systems The proposed thresholds are far too small. A "Bulk Power" facility begins at 1 MW or 4 MWh, a system that may fit in one or two shipping-container-sized enclosures. Treating a system of that size like a large utility-scale facility will sweep in modest projects that pose no unique land use concerns. The "Distributed" tier is even broader. It would regulate commercial, industrial, institutional, and microgrid systems starting at only 80 kWh, capturing: · batteries paired with rooftop solar at small businesses, · backup power at schools, churches, and hospitals, · battery-buffered EV charging, · storage at multifamily properties. These customer-sited systems serve on-site load. They are already governed by the City's adopted building, electrical, and fire codes, and other Arizona jurisdictions have excluded them. Mesa expressly excludes accessory systems serving the enterprise functions of the on-site owner or tenant.[1] Maricopa County distinguishes utility-scale systems from customer-sited systems.[2] The tier structure also leaves gaps. Behind-the-meter systems at or above 1 MW, and front-of-the-meter systems below 1 MW, fall into neither tier. Under the use tables, they would have no permitted path. AriSEIA recommends eliminating the Distributed tier. All commercial, industrial, and institutional behind-the-meter systems should be exempt, and at a minimum any such system under 10 MW. The ordinance should apply only to front-of-the-meter, utility-scale facilities of 10 MW or greater. At an absolute minimum, the City should follow the City of Surprise, which adopted a 5 MW threshold for accessory battery systems in its BESS ordinance on September 1, 2026.[3] Surprise has more direct experience with BESS safety than any jurisdiction in Arizona, and it concluded that systems of this size do not warrant the same treatment as utility-scale facilities. Tucson's proposed thresholds of 80 kWh and 1 MW are far below that benchmark. 2. Limiting the Ordinance to Lithium-Ion Technology The proposed definition covers "chemical, electrochemical, or mechanical" storage. The standards that follow, however, are framed around lithium-ion thermal runaway and off-gassing. Technologies such as flow batteries, iron-air, sodium-based chemistries, and mechanical storage have different characteristics and risk profiles. There is no evidentiary basis for assuming that the separation distances, barrier walls, and hazard standards in this proposal are appropriate for them. National Fire Protection Association (NFPA) 855 already contains technology-specific provisions for these systems. Applying lithium-ion-based zoning standards to every storage technology risks both over-regulating emerging technologies and locking in requirements the City may later need to undo. AriSEIA recommends the following definition: "Battery Energy Storage System (BESS), Utility-Scale: A stationary lithium-ion battery energy storage facility with a rated power capacity of 10 MW or greater, located in front of the customer meter and designed for energy market participation or grid services. Systems installed behind the customer meter or primarily serving on-site load, including residential, commercial, industrial, and institutional systems, are exempt from this use and its associated standards. Energy storage technologies other than lithium-ion shall be classified as a Distribution System use and reviewed in accordance with the City's adopted building, electrical, and fire codes." 3. Zoning Districts and Solar-Plus-Storage Bulk BESS is limited to industrial zones by right and to C-2, C-3, and P-I by special exception. Utility-scale storage is often best located in rural and large-lot areas near transmission and away from population centers. The special exception process already lets the City evaluate compatibility case by case. AriSEIA recommends making utility-scale BESS eligible for special exception review in rural and large-lot districts. AriSEIA also supports the City’s previous consideration of classifying BESS as a utility distribution use. BESS should be allowed in the same zoning districts where Distribution Systems are currently permitted, including C-1, C-2, C-3, OCR-1, and OCR-2, subject to sensible and industry-vetted use-specific standards. This approach recognizes the role that energy storage plays in supporting electric system reliability while providing the City with clear review standards. The ordinance should also state that BESS is a permitted accessory use to an approved solar facility, without a separate approval. 4. Separation Requirements AriSEIA appreciates that the proposed 150-foot residential separation is consistent with Buckeye's adopted standard and the range identified by the American Planning Association.[4] Maricopa County requires 100 feet from lot lines.[5] However, the separation should be measured to existing residential structures, not to a residential zoning district boundary line. A zoning boundary line may border vacant land, rights-of-way, or portions of a parcel hundreds of feet from any home. Measuring to the boundary line effectively expands the separation well beyond 150 feet. It does so without any corresponding safety benefit, because the stated purpose of the separation is to protect people. AriSEIA recommends: "An outdoor utility-scale BESS shall be located no closer than one hundred fifty feet (150') from an existing residential dwelling unit, measured in a straight line from the outermost battery cabinet to the nearest exterior wall of the dwelling." The additional 300-foot separation from schools, daycares, hospitals, senior living, and "high-occupancy assembly use" should be removed. These are the very facilities most likely to install batteries themselves for backup power and resilience, often inside or immediately adjacent to the occupied building. A rule that treats a battery 299 feet from a hospital as unacceptable, while the hospital may operate its own battery on site, is internally inconsistent and has no technical basis. "High-occupancy assembly use" is also undefined, which invites inconsistent application. The 150-foot standard measured to existing structures is sufficient. The relief mechanism also needs revision. It allows only a 25% reduction, and only on a showing that a barrier wall achieves "identical safety metrics." Standard 7 already requires that wall, so the same mitigation is counted against the applicant twice. It should be replaced with the general waiver discussed below. 5. No Retroactive Application Several provisions, including the abandonment standard, apply to "any BESS facility" without limitation. BESS facilities should be required to comply with the zoning requirements in effect when they are installed. They cannot practically be required to meet new standards retroactively. An existing facility cannot be relocated to satisfy a new separation distance. It cannot be rebuilt behind a wall designed after it was constructed. It cannot re-engineer equipment to meet a noise limit that did not exist when it was permitted. AriSEIA recommends adding: "The requirements of this section apply only to BESS facilities for which a complete application is submitted after the effective date. Facilities installed, permitted, or with a complete application on file before the effective date shall be governed by the regulations in effect at that time. Routine maintenance, repair, and augmentation within the approved footprint shall not subject an existing facility to this section." 6. Hazard Evaluation and Reliance on National Standards Standard 5 requires an applicant to demonstrate, to the satisfaction of the City, that "any potential failure scenario" can be contained on-site. That standard is subjective and open-ended, and no applicant can meet it with certainty. National standards already address this subject comprehensively. NFPA 855 requires: · a Hazard Mitigation Analysis, · an emergency response plan, · commissioning, · large-scale fire testing under UL 9540A for systems listed to UL 9540.[6] AriSEIA recommends that Standards 3 through 5 expressly require compliance with the currently adopted edition of NFPA 855, UL 9540, and UL 9540A. Those submittals should be due at building permit, when equipment and design are known, rather than at zoning approval. 7. Noise The proposed limits of 55 dBA at a commercial property line and 45 dBA at a residential property line are far too low. A 55 dBA limit at a commercial property line is roughly the level of normal conversation. It is quieter than the rooftop HVAC equipment found on virtually every commercial building in Tucson. The residential limit is quieter still. These limits are not applied to other utility or mechanical uses. They would single out BESS in the same package in which the City is updating its general noise regulations. AriSEIA recommends that BESS be subject to the same noise rules as other land uses. In the alternative, the ordinance should use an objective limit of 65 dBA at the project boundary, demonstrated by a qualified acoustical engineer. 8. Indoor Requirement Standard 11 requires BESS to be located entirely within an enclosed primary structure or parking garage, with any outdoor installation requiring a special exception. Requiring BESS to be placed within enclosed structures or parking garages runs counter to the direction of modern industry practice. Based on industry lessons learned from operating experience and battery incidents, the industry has moved towards outdoor BESS installations in non-occupiable enclosures, rather than locating batteries inside occupiable or enclosed buildings. Outdoor installations are the safer and more appropriate configuration for BESS. . Indoor installations generally trigger more demanding fire code requirements than outdoor ones. They are also harder for firefighters to access and ventilate. Outdoor siting in purpose-built enclosures is often the configuration fire officials prefer. Parking garages in particular are enclosed, occupied spaces that are poorly suited to battery placement. The provision would also bar a standard outdoor cabinet behind a downtown building without a special exception, while pushing the same equipment into a less desirable indoor location. AriSEIA recommends removing Standard 11 and allowing outdoor installations in these zones subject to the same standards that apply elsewhere. 9. Walls and Landscaping AriSEIA does not object to 8-to-10-foot screen walls where screening is appropriate. However, Standard 7 goes further. It requires every outdoor equipment yard to be enclosed by a reinforced masonry wall "designed to serve as a thermal and blast barrier." No national standard defines or calls for such a wall. NFPA 855 addresses explosion control at the enclosure level, and a solid perimeter wall can complicate ventilation and fire department access. Standard 8 adds a mandatory 10-foot landscape border outside the wall, which increases land requirements and water use. AriSEIA recommends treating walls as screening rather than blast barriers. Staff should also have authority to approve alternative perimeter treatments where site conditions warrant, as Buckeye and Maricopa County allow. 10. Decommissioning and Abandonment Standard 9 requires restoration to a "greenfield state." That is not a meaningful standard for sites that were parking lots or previously-developed land before BESS construction. It also requires a recorded plan signed by the system operator before building permit, when the operator may not yet be known. Restoration should be to pre-construction condition, and the plan should be due before certificate of occupancy. Standard 10 deems a facility abandoned after 12 months without operating or delivering power to the grid. The standard should: · apply only to utility-scale facilities installed after the effective date, · exclude periods of repair, augmentation, interconnection delay, and force majeure, · clarify what "deploy" means. 11. Waiver and Administrative Modifications The ordinance should include a general waiver provision and administrative approval of routine modifications. AriSEIA recommends: "The Zoning Examiner may grant a waiver from specific requirements of this section upon a finding that the proposed alternative provides equivalent or greater protection for public safety and compatibility with surrounding land uses." "Administrative approval may be granted for modifications that do not increase the approved project footprint, reduce required separations, or materially alter approved access, emergency response, or fire protection features." Conclusion Battery storage is increasingly essential to grid reliability and affordability in Southern Arizona. A well-designed ordinance can protect residents while giving applicants a clear, workable path. The current proposal does not do that. Its size thresholds are too small, and it reaches customer-sited systems that should be exempt. It applies lithium-ion-based standards to technologies they were not designed for, and measures separation to zoning lines rather than homes. It penalizes proximity to facilities that use batteries themselves, and it imposes noise and indoor-siting requirements that do not reflect real-world conditions or fire safety practices. These issues can be resolved, but not in three business days. AriSEIA respectfully asks the Commission to continue or sever the BESS amendment, and we welcome the opportunity to work with staff on a revised proposal. Respectfully, /s/ Autumn T. Johnson Executive Director AriSEIA (520) 240-4757 [email protected] [1] Mesa City Code § 11-31-37; Mesa Resolution 12441 (Dec. 1, 2025), https://www.mesaaz.gov/files/assets/public/v/1/business-development/devsvcs/codesords/bess-adoption-by-ref-doc.pdf. [2] Maricopa County Zoning Ordinance art. 603.10, https://esd.maricopa.gov/DocumentCenter/View/4785/P-18---Zoning-Ordinance-PDF?bidId=. [3] City of Surprise, Ordinance No. [____] (Sept. 1, 2026), Case FS23-1041, Battery Energy Storage System Overlay. [4] American Planning Association, Zoning Practice: Battery Energy Storage Systems 10 (Mar. 2024), https://planning-org-uploaded-media.s3.amazonaws.com/publication/download_pdf/Zoning-Practice-2024-03.pdf; City of Buckeye Development Code § 3.2, https://library.municode.com/az/buckeye/codes/code_of_ordinances?nodeId=CD_ORD_CH7DECO. [5] Maricopa County Zoning Ordinance art. 603.10, supra note 2. [6] NFPA 855, Standard for the Installation of Stationary Energy Storage Systems (2023 ed.); UL 9540, Energy Storage Systems and Equipment; UL 9540A, Test Method for Evaluating Thermal Runaway Fire Propagation in Battery Energy Storage Systems.
0 Comments
|
AriSEIA NewsKeep up with the latest solar energy news! Archives
October 2026
Categories
All
|
RSS Feed